Gony struggle gettin anything or anyone through the side door! Al is that a planned security feature?
I,ll have you know, I have an O level in Maffs my good man. I have special anti gravity 4 x 2s on that side.
ha strange your doing this now. I picked up a 8ft by 10ft workshed for mum a week ago. 3 tons of base, bricks and slaps went down last week. killed my legs and back and about to put up her shed tomorrow. got one of these from Costco for a good price http://www.lifetime.com/gallery/storage/outdoor-storage-buildings/8-foot-wide-sheds/60019
Funnily enough I've been looking at the same shed at Costco, but after the offer finished the keter 8'x11' works out cheaper online from costco
The quality is bloody good mate but 2 boxes about 100kg each is not fun moving on your own. Here is what I've been doing Just working to get the base just sorted to hold the shed them build out where needed. Had to remove the trees and old shed first
Oy, Remal, bugger off and start yer own shed thread!!! Got a lot done today, worked until dark , so no finish pictures. Can't see any problem with personnel door access??? Closed; Open;
I know u was mate the shed is going up today. says takes 3 people 4-5 hours. I'm hoping I can just get the shed up on my own today. fingers crossed
That,s the worst part. I need good weather to dry wood out and work, but I want to ride my bike when it,s sunny. As soon as it,s ready, I,ll be picking up my latest toy, vfr400nc30.!!!
I'm lucky, bike not mot but sunny , well at least dry.ive been at it 2 hours now, base down. doors finished as in locks hinges, roof braces etc and base just gone down
Couldn't take pix of yesterday's progress, so I took some this morning; Was supposed to be having all day on it today, but major problems with my mate's CBR600 meant I only got a bit done; Got a few hours tomorrow, but I'm gonna buy some extra wood , mainly 2" x 2" to reinforce the sides, beef up the joists and make another joist.